
Marine · FEA
Davit arm for a ship
- Challenge
- A davit arm had to meet the reviewer’s strength requirements for all load cases before fabrication.
- What was done
- FEA of the arm and its connections for all required load cases, with a report structured for the reviewer.
- Result
- Approved on the first submission, with no redesign loop.



















